Permits and locates checked ahead
Barry lists installs in the next ten days with an open permit or utility locate, so the office can act before the auger is loaded.
Barry reads your FenceCRM schedule to find open locates, brief crews and write up added gates and footage. It can read and take action in your connected software.

The Harbor Storage locate was asked for the wrong frontage. The plan digs on the alley side.
Barry looks ten days ahead for open permits and locates, fills out crew notes in English or Spanish, and prices change orders for added fence.
Barry lists installs in the next ten days with an open permit or utility locate, so the office can act before the auger is loaded.
Plan, materials and access checked for each job, with notes drafted in both languages and what’s missing asked for.
A moved gate or extra run becomes a change order priced from your pricebook, held for approval before the crew builds it.
Send Barry a message like one of these and it sets up the work across FenceCRM and your other connected tools.
“Every morning, list FenceCRM installs in the next ten days that still have an open permit or utility locate.”
“Every afternoon, check tomorrow’s crew packets for site plan, materials and access notes, and draft a message for what’s missing.”
“Draft a FenceCRM change order for the Lakeside job: move the drive gate 12 feet and add a 4-foot walk gate.”
“When an install is marked complete, draft the final invoice in QuickBooks with its change orders and hold it for my OK.”
Connect once, say what you need, and stay in control of anything that leaves your business.
Add your FenceCRM login on Barry’s Integrations page. Barry signs in, and can read and take action within what that login allows.
Describe the work the way you’d brief a new hire. Barry sets it up and tells you when it will run.
Drafts for customers, GCs and subs wait for your OK. The routine work gets done, and Barry tells you what it did.
Barry works across all your connected tools at once. See every integration
