All integrations

Barry matches up your Moraware job packets.

Barry uses the Moraware exports and job files you share to check cutouts, ready sites and find stuck jobs. It can read and take action in your connected software.

What Barry does around Moraware.

Barry compares the quote, drawing and sink sheet before the cut, drafts template-day notes, and lists jobs stuck without an approval or install date.

Packets checked before the cut

Quote, drawing and sink sheet compared on edge, cutout and overhang, so a 33-inch cutout for a 30-inch sink doesn’t cost a slab.

Template-day notes drafted

Cabinets set, sink on site, old tops out: a short note for each address on tomorrow’s list, held for the front desk to approve.

Jobs waiting on an approval

Jobs templated three or more days ago with no approval or install date, taken off the schedule export so the office can chase them.

Ask for it in plain words.

Send Barry a message like one of these and it sets up the work around Moraware, using your connected tools.

  • “Check the Aspen Court job packet: do the quote, drawing and sink spec agree on edge, cutouts and overhang?”

    Packet checkWhen you ask
  • “Every day at 2, draft a template-day note for each address on tomorrow’s list for the front desk to approve.”

    Template-day notesEvery weekday · 2:00 PM
  • “Each morning, use the schedule export in the shop folder to list jobs templated three days ago with no approval yet.”

    Waiting on approvalEvery weekday · 6:30 AM
  • “When a builder approves a drawing by email in Outlook, match it to the schedule export and tell the scheduler which job can get a date.”

    Approval to install dateWhen an approval arrives

How Barry connects to Moraware.

Connect once, say what you need, and stay in control of anything that leaves your business.

  1. Connect Moraware

    Choose Moraware on Barry’s Integrations page. Our team helps you get set up, and once it’s connected Barry can read and take action in it.

  2. Tell Barry the job

    Describe the work the way you’d brief a new hire. Barry sets it up and tells you when it will run.

  3. Approve what goes out

    Drafts for customers, GCs and subs wait for your OK. The routine work gets done, and Barry tells you what it did.

Questions about Barry and Moraware.

Do I have to stop using Moraware?
No. Jobs, the calendar and CounterGo quotes stay where they are. Save the quote, drawing and sink sheet to a shared folder, or email the schedule export, and Barry checks those.
What does Barry compare in a packet?
Edge, cutouts, sink model and overhang across the quote, the drawing and the sink sheet. It lists what disagrees, and your programmer confirms before cutting.
Will Barry email a builder or move a date without me?
No. Whoever you choose in the office approves each note, and your scheduler makes any date change in Moraware.

Put Barry to work around Moraware.

Or Book a demo

A BARRY banner tied onto the scaffolding of an apartment block