Barry follows your Microsoft Project dates.

Barry reads your Microsoft Project plans to draft look-aheads, tell subs about moved dates and explain slips. It can read and take action in your connected software.

What Barry does in Microsoft Project.

Barry drafts a three-week look-ahead by trade, writes to the subs behind a moved date, and compares plans or exports with your saved baseline.

Three-week look-aheads by trade

Barry takes the next three weeks of the plan and drafts a sheet by area and trade, for your PM to check and hand to the field.

Subs told when a date moves

When a task slips, Barry lists the work behind it and drafts a note to each affected sub with the old and new start for approval.

Slips measured against baseline

Barry lists tasks running behind the baseline, the days lost and what they push, while there’s float left to use.

Ask for it in plain words.

Send Barry a message like one of these and it sets up the work across Microsoft Project and your other connected tools.

  • “Every Thursday, draft a three-week look-ahead for Hillcrest by trade and send it to me to check.”

    Three-week look-aheadEvery Thu · 2:00 PM
  • “When steel moves out, list the tasks behind it and draft a note to those subs with their new dates for my approval.”

    Notes on new datesWhen a date changes
  • “Every Monday, compare the Microsoft Project exports we share with their baselines and list slipped tasks and what they push.”

    Slips against baselineEvery Mon · 7:00 AM
  • “Before the owner’s meeting in Outlook, draft half a page on where the finish date stands and why, and attach it for my review.”

    Schedule note for the ownerDay before an owner meeting

How Barry connects to Microsoft Project.

Connect once, say what you need, and stay in control of anything that leaves your business.

  1. Connect Microsoft Project

    Add your Microsoft Project login on Barry’s Integrations page. Barry signs in, and can read and take action within what that login allows.

  2. Tell Barry the job

    Describe the work the way you’d brief a new hire. Barry sets it up and tells you when it will run.

  3. Approve what goes out

    Drafts for customers, GCs and subs wait for your OK. The routine work gets done, and Barry tells you what it did.

Questions about Barry and Microsoft Project.

Do I have to stop using Microsoft Project?
No. The schedule and its baseline stay in Microsoft Project, and your scheduler keeps the dates. Barry drafts the look-aheads, notes and slip lists from it.
What can Barry open in Microsoft Project?
Plans your Microsoft web login shows. Project for the web is now Planner, and Project Online ended September 30, 2026. For desktop files, send the file or an export and Barry works from that.
Will Barry move dates or tell subs without me?
No. Look-aheads and notes to subs are drafted for your approval. Changing the plan is your scheduler’s job.

Put Barry to work in Microsoft Project.

Or Book a demo