All integrations

Barry works from the WinEst exports you share.

Barry uses the WinEst exports you share to explain budget changes, test unit costs and level sub bids. It can read and take action in your connected software.

What Barry does around WinEst.

Barry compares two WinEst exports and writes up what moved, checks cost per square foot against finished jobs, and levels the sub bids you were emailed.

Budget changes written up

Barry sets the DD export beside SD, lists the divisions that moved and the sheet behind each, and drafts a page for the owner meeting.

Unit costs tested on finished jobs

Barry sets cost per square foot by division beside your finished jobs and flags what sits outside their range, high or low.

Sub bids levelled with exclusions

Barry lays emailed bids side by side with what each one excludes, so fire alarm or temporary power isn’t found after award.

Ask for it in plain words.

Send Barry a message like one of these and it sets up the work around WinEst, using your connected tools.

  • “Compare the DD and SD exports for Harbor Street and draft a page on the biggest changes for me to check before the owner meeting.”

    What changed since SDWhen a new version is ready
  • “Set the export I share beside our finished jobs by division and list the costs per square foot that look off.”

    Outliers against past jobsWhen you share an export
  • “Level the electrical bids in this folder and list what each one excludes.”

    Sub bid levellingOn bid day
  • “On the first, add last month’s finished jobs to our Excel cost history, with cost per square foot by division.”

    Cost history sheet1st of the month · 8:00 AM

How Barry connects to WinEst.

Connect once, say what you need, and stay in control of anything that leaves your business.

  1. Connect WinEst

    Choose WinEst on Barry’s Integrations page. Our team helps you get set up, and once it’s connected Barry can read and take action in it.

  2. Tell Barry the job

    Describe the work the way you’d brief a new hire. Barry sets it up and tells you when it will run.

  3. Approve what goes out

    Drafts for customers, GCs and subs wait for your OK. The routine work gets done, and Barry tells you what it did.

Questions about Barry and WinEst.

Do I have to stop using WinEst?
No. Your estimates and cost database stay in WinEst and stay yours to update. You share the exports and Barry works from those.
How does Barry explain a change in the budget?
It lines the two exports up by division, sorts the differences by size, and looks for the drawing change behind each. Where it can’t find one, the line is marked for your estimator.
Will Barry send an owner summary without me?
No. The page waits as a draft with its assumptions and sources listed. An estimator approves it before anyone outside the office sees it.

Put Barry to work around WinEst.

Or Book a demo

A BARRY banner tied onto the scaffolding of an apartment block